Tesuco
Silverwater, Western Sydney NSW

Office fitout and warehouse upgrade project delivered by DY Constructions for Tesuco

Project Details

Location

Silverwater, Western Sydney NSW

Industry

Equipment Supply

Size

200m2

Value

$150k

Designer

DY Constructions Australia

Duration

5 weeks

Delivery Method

Lump Sum

  • Multi-stage refurbishment across ground and first floors
  • Custom reception desk with laminated joinery
  • Glazed partitions and sliding door suites
  • Kitchenette installation with overhead cupboards and splashbacks
  • Electrical, data, and lighting upgrades
  • Swipe card access system installation

Project overview

Multi-stage office and warehouse upgrades delivered for Tesuco, including insulation, partitioning, and concrete floor sealing across various internal areas.

Client Brief

Tesuco engaged DY Constructions Australia to complete a staged office refurbishment across two floors of their Sydney premises. The client sought to modernise their workspace by creating new enclosed offices, improving the reception area, and upgrading key amenities including kitchen joinery and data cabling. DY was responsible for the full delivery of these works, including internal wall modifications, glazing, electrical and lighting upgrades, and access control systems.

Challenges

Given the live office environment, works had to be completed in stages to minimise disruption to staff. Tight spatial layouts also required careful planning to ensure the new rooms complied with accessibility standards while maintaining functionality.

The Solution

DY coordinated each stage of the project with minimal impact to the client’s operations, implementing temporary protections where necessary. Detailed site measurements and close liaison with the client ensured all spatial arrangements were practical and compliant. Any layout adjustments were resolved proactively during construction.

The Result

The project was delivered on time and on budget, resulting in a refreshed and functional office environment. Tesuco’s updated reception area and new internal spaces now support improved workflow and staff experience. The client expressed satisfaction with the quality and efficiency of the works completed.

Get In Touch

Please Submit Your Enquiry and our friendly staff will contact you to arrange a free consultation at your premises to discuss your project in detail.

Scope of Works

  • Office Alterations – Supply and installation of 90mm steel stud walls with 13mm plasterboard lining to form new meeting rooms and workspaces across both levels. Integration of full-height glazed partitions and sliding doors for natural light and acoustic separation.
  • Reception Fitout – Construction of a custom-built reception counter with laminated joinery, feature bulkhead, and wall returns. Installation of aluminium-framed shopfront glazing and new entry suite.
  • Kitchen Joinery – Installation of new kitchen cabinetry, including base and overhead cupboards, laminated benchtops, stainless steel sink, splashbacks, and open shelving.
  • Electrical & Lighting – Supply and installation of new power points, LED lighting, data cabling, switchboard modifications, and surface-mounted GPOs as required.
  • Security & Access – Implementation of a swipe card access system, keypad control, and additional door security measures.
  • Staging & Coordination – Works delivered in multiple stages with after-hours scheduling to minimise disruption to daily operations. Temporary protection measures used where applicable.