MTC Australia Redfern
Redfern & Marrickville, Inner West Sydney, NSW

Office fitout and make good project delivered by DY Constructions for MTC Australia Redfern

Project Details

Location

Redfern & Marrickville, Inner West Sydney, NSW

Industry

Training and Employment Services

Size

240m2

Value

$90k

Designer

DY Constructions Australia

Duration

xxx weeks

Delivery Method

Lump Sum

  • Make good works at end-of-lease Marrickville tenancy
  • Demolition of partitions, joinery, data cabling, and signage
  • Patch and paint to walls and ceilings for handover
  • New fitout at Redfern with full-height partitions and glazed doors
  • Acoustic insulation installed to reduce sound transfer
  • Power and data upgrades throughout the tenancy
  • Fire services adjusted to suit new room layouts
  • Works coordinated under certifier and council requirements

Project overview

Office relocation delivered for MTC Australia with make good works in Marrickville and new fitout at Redfern headquarters.

Client Brief

ProGroup Management engaged DY Constructions Australia to elevate the quality and functionality of their office environment and accommodate a growing team. The client sought a modern, well-planned fitout that would maximise workspace efficiency while enhancing overall presentation.

DY delivered a full-scope solution across two levels, including new office partitions, custom joinery, acoustic upgrades, flooring, furniture, lighting, and services. The works were tailored to support both day-to-day operations and future expansion.

Challenges

The client initially provided a floorplan that did not meet BCA and accessibility requirements, requiring DY to redesign the layout to ensure full compliance. As part of the brief to expand the office, the client also requested that the workspace extend into the existing warehouse—a complex adjustment that required careful consideration of mechanical systems and building code constraints.

Additionally, the client aimed to maximise workstation capacity within a limited footprint. DY had to carefully plan and adjust workstation placement to achieve optimal density without compromising usability or compliance, accommodating several design changes throughout the process.

The Solution

DY collaborated closely with a private certifier to review the client’s initial drawings, making iterative adjustments until the layout achieved full compliance and met the client’s functional needs. This ensured the final plan was both regulation-compliant and aligned with the intended use of the space.

For the office extension into the warehouse, DY coordinated layout modifications and installed a new air conditioning system to service the expanded area, ensuring the build met mechanical and BCA requirements. To address space constraints, DY carefully planned the workstation layout to maximise capacity without compromising movement, comfort, or compliance—successfully delivering a design that met the brief.

The Result

The project was completed to the client’s satisfaction, with DY securing the Occupation Certificate in time for ProGroup Management’s planned move-in. The final scope included full office partitioning, custom joinery, acoustic panels, flooring, lighting, electrical and data works, workstation installation, and new air conditioning for the expanded office area—delivered as a complete, compliant fitout solution.

Get In Touch

Please Submit Your Enquiry and our friendly staff will contact you to arrange a free consultation at your premises to discuss your project in detail.

Scope of Works

  • Make Good – Marrickville
    DY completed end-of-lease make good works at MTC’s previous tenancy, including:

    • Demolition and removal of all internal partitions, loose joinery, and redundant cabling

    • Removal of all signage, wall-mounted items, and loose fittings

    • Patching and painting of walls and ceilings to base building condition

    • Final cleaning and preparation for landlord handover

     

  • Fitout – Redfern
    Upon relocation, DY completed a full office fitout at MTC’s new Redfern location:

    • Construction of new full-height partitions with acoustic insulation

    • Installation of glazed aluminium-framed doors to suit meeting rooms and offices

    • Coordination of mechanical, fire, and electrical services for new layout

    • Supply and installation of general power, lighting, and data points

    • Painting of all new walls and integration with existing finishes

    • Delivery of compliant fitout with support from private certifier and council approvals