MTC Australia Surry Hills
Surry Hills, Inner Sydney NSW

Office fitout and make good project delivered by DY Constructions for MTC Surry Hills

Project Details

Location

Surry Hills, Inner Sydney NSW

Industry

Training and Employment Services

Size

50m2

Value

$60k

Designer

DY Constructions Australia

Duration

xxx weeks

Delivery Method

Lump Sum

  • Office strip-out and minor demolition
  • Reconfiguration of partition layout
  • New carpet tile installation
  • Ceiling grid and tile reinstatement
  • Fresh internal paint throughout
  • Electrical and data modifications
  • Compliance with BCA and accessibility standards

Project overview

Office fitout for MTC Surry Hills featuring glazed partitioning, essential services coordination, ceiling works and optional acoustic upgrades.

Client Brief

ProGroup Management engaged DY Constructions Australia to elevate the quality and functionality of their office environment and accommodate a growing team. The client sought a modern, well-planned fitout that would maximise workspace efficiency while enhancing overall presentation.

DY delivered a full-scope solution across two levels, including new office partitions, custom joinery, acoustic upgrades, flooring, furniture, lighting, and services. The works were tailored to support both day-to-day operations and future expansion.

Challenges

The client initially provided a floorplan that did not meet BCA and accessibility requirements, requiring DY to redesign the layout to ensure full compliance. As part of the brief to expand the office, the client also requested that the workspace extend into the existing warehouse—a complex adjustment that required careful consideration of mechanical systems and building code constraints.

Additionally, the client aimed to maximise workstation capacity within a limited footprint. DY had to carefully plan and adjust workstation placement to achieve optimal density without compromising usability or compliance, accommodating several design changes throughout the process.

The Solution

DY collaborated closely with a private certifier to review the client’s initial drawings, making iterative adjustments until the layout achieved full compliance and met the client’s functional needs. This ensured the final plan was both regulation-compliant and aligned with the intended use of the space.

For the office extension into the warehouse, DY coordinated layout modifications and installed a new air conditioning system to service the expanded area, ensuring the build met mechanical and BCA requirements. To address space constraints, DY carefully planned the workstation layout to maximise capacity without compromising movement, comfort, or compliance—successfully delivering a design that met the brief.

The Result

The project was completed to the client’s satisfaction, with DY securing the Occupation Certificate in time for ProGroup Management’s planned move-in. The final scope included full office partitioning, custom joinery, acoustic panels, flooring, lighting, electrical and data works, workstation installation, and new air conditioning for the expanded office area—delivered as a complete, compliant fitout solution.

Get In Touch

Please Submit Your Enquiry and our friendly staff will contact you to arrange a free consultation at your premises to discuss your project in detail.

Scope of Works

  • Make Good & Demolition – Internal strip-out of the existing tenancy including removal of partitions, redundant floor finishes, and loose furniture in preparation for refurbishment.
  • Partition Works – Minor reconfiguration of wall layouts using plasterboard partitions to suit new office layout, including adjustment of door openings and hardware.
  • Floor Finishes – Supply and installation of new carpet tiles across the tenancy, including adhesive and subfloor preparation.
  • Ceiling Works – Reinstatement of ceiling grid and tiles as required following demolition and partition works to maintain uniformity.
  • Painting – Application of low-VOC internal paint throughout the tenancy, including walls, doors, and trims.
  • Electrical & Data – Disconnection of redundant services and minor adjustments to suit new workstation and room layout; allowance for general power and data.
  • Compliance & Finalisation – Works completed in accordance with NCC/BCA standards, including fire egress and accessibility; detailed clean on completion.