Frenchs Forest, Northern Beaches NSW

Strip out and Make Good project delivered by DY Constructions for Jazmar Investments

Project Details

Location

Frenchs Forest, Northern Beaches NSW

Industry

Property and Investment

Size

550m2

Value

$140k

Designer

DY Constructions Australia

Duration

xxx weeks

Delivery Method

Lump Sum

  • Full commercial stripout across two levels
  • Ceiling tile and grid removal
  • Workstation and joinery dismantle
  • Floor box and power disconnection
  • Electrical disconnection and make safe
  • Removal of fixtures, fittings and signage
  • Patch and paint throughout tenancy
  • Warehouse and office make good works

Project overview

Full Commercial Stripout and Base Build Restoration for Jazmar Investments, Frenchs Forest.

Client Brief

ProGroup Management engaged DY Constructions Australia to elevate the quality and functionality of their office environment and accommodate a growing team. The client sought a modern, well-planned fitout that would maximise workspace efficiency while enhancing overall presentation.

DY delivered a full-scope solution across two levels, including new office partitions, custom joinery, acoustic upgrades, flooring, furniture, lighting, and services. The works were tailored to support both day-to-day operations and future expansion.

Challenges

The client initially provided a floorplan that did not meet BCA and accessibility requirements, requiring DY to redesign the layout to ensure full compliance. As part of the brief to expand the office, the client also requested that the workspace extend into the existing warehouse—a complex adjustment that required careful consideration of mechanical systems and building code constraints.

Additionally, the client aimed to maximise workstation capacity within a limited footprint. DY had to carefully plan and adjust workstation placement to achieve optimal density without compromising usability or compliance, accommodating several design changes throughout the process.

The Solution

DY collaborated closely with a private certifier to review the client’s initial drawings, making iterative adjustments until the layout achieved full compliance and met the client’s functional needs. This ensured the final plan was both regulation-compliant and aligned with the intended use of the space.

For the office extension into the warehouse, DY coordinated layout modifications and installed a new air conditioning system to service the expanded area, ensuring the build met mechanical and BCA requirements. To address space constraints, DY carefully planned the workstation layout to maximise capacity without compromising movement, comfort, or compliance—successfully delivering a design that met the brief.

The Result

The project was completed to the client’s satisfaction, with DY securing the Occupation Certificate in time for ProGroup Management’s planned move-in. The final scope included full office partitioning, custom joinery, acoustic panels, flooring, lighting, electrical and data works, workstation installation, and new air conditioning for the expanded office area—delivered as a complete, compliant fitout solution.

Get In Touch

Please Submit Your Enquiry and our friendly staff will contact you to arrange a free consultation at your premises to discuss your project in detail.

Scope of Works

  • Demolition & Stripout – Removal of ceiling grid and tiles, loose furniture, workstations, wall-mounted joinery, blinds, TV brackets, and wall fixings across both levels.
  • Electrical & Data – Disconnection of general power, floor boxes, light switches, and redundant electrical fixtures, followed by make-safe procedures.
  • Joinery & Fixtures – Dismantling of kitchen base joinery, storage units, and miscellaneous fixtures, including removal of wall linings as required.
  • Make Good Works – Patch repair to penetrations and wall surfaces, painting throughout tenancy to match existing finishes, and restoration of warehouse and office areas to base building condition.
  • Final Clean & Waste Removal – Stripout debris removal and detailed clean of floors, walls, and warehouse slab prior to handover.