// Menu sub headings

1300 737 656

Call us now for your free site consultation. Specialising in Small, Medium and Large projects.

Clarence
Sydney CBD, NSW

Office refurbishment delivered by DY Constructions for Clarence

Project Details

Location

Sydney CBD, NSW

Industry

Real Estate and Legal Support

Size

200m2

Value

$140k

Designer

DY Constructions Australia

Duration

4 weeks

Delivery Method

Lump Sum

  • Minor commercial office refurbishment
  • Reception and hallway flooring upgrade
  • Kitchen joinery and benchtop replacement
  • Calcatta Viola stone splashback finish
  • Reception credenza panel replacement
  • Patch painting to existing interior walls
  • Repainting of existing timber doors
  • Reupholstery of kitchen cushion seating
  • Minor electrical and plumbing works
  • After-hours delivery and staged program

Project overview

Commercial office refurbishment completed for Clarence, featuring new kitchen joinery, vinyl plank flooring, and upgraded workplace finishes.

Client Brief

Clarence engaged DY Constructions Australia to complete a minor commercial office refurbishment within their occupied Sydney CBD tenancy. The brief focused on upgrading selected internal areas, including flooring, kitchen joinery, painting, seating upholstery, and finishes, while allowing the business to continue operating throughout the works.

Challenges

The project was delivered in a live office environment, with neighbouring tenancies and occupied work areas limiting access during standard hours. Works had to be completed after hours and section by section, requiring careful noise control, foot traffic management, and strict coordination to avoid disrupting daily operations within the building.

The Solution

DY implemented a staged after-hours programme, coordinating trades around the client’s operational requirements and building access conditions. Work areas were managed progressively to maintain safe circulation, minimise disruption, and complete noisy or high-impact works within controlled timeframes.

The Result

The completed refurbishment refreshed Clarence’s office environment with upgraded finishes, improved kitchen functionality, new flooring, and reupholstered seating. Despite the live environment constraints, DY delivered the works efficiently with minimal disruption to the client and surrounding tenancies.

Get In Touch

Please Submit Your Enquiry and our friendly staff will contact you to arrange a free consultation at your premises to discuss your project in detail.

Scope of Works

  • Site Preparation – WHS setup, temporary containment, lift protection, floor protection, after-hours deliveries, and coordination with building management.
  • Make Good Works – Installation of U-shaped corner angles to the existing operable wall to assist with reducing sound penetration.
  • Painting Works – Patch painting to existing interior walls, including repairs and preparation, plus repainting of forty existing timber doors.
  • Floor Finishes – Removal of existing vinyl plank flooring, floor preparation, and installation of new commercial-grade Karndean “Pavimento Avanti” vinyl planks to reception, hallway, and kitchen areas.
  • Kitchen Joinery – Removal and replacement of existing kitchen carcass, cabinet fronts, stone benchtop, and splashback.
  • Reception Joinery – Replacement of reception credenza face panels and melamine top, with finishes selected from standard Laminex or Polytec ranges.
  • Seating Upholstery – Reupholstery of existing kitchen cushion seating using fabric selected from the Warwick Fabrics commercial range.
  • Essential Services – Minor electrical works, fire protection isolation, plumbing disconnection and reconnection, and replacement of selected kitchen lighting.
  • Completion Works – Waste removal, recycling where practical, progress cleaning, final trade clean, project management, quality control, and handover.

Related Projects