// Menu sub headings

1300 737 656

Call us now for your free site consultation. Specialising in Small, Medium and Large projects.

Finstro
Sydney CBD, NSW

Office Fitout project delivered by DY Constructions for Finstro

Project Details

Location

Sydney CBD, NSW

Industry

Financial Services

Size

200m2

Value

$130k

Designer

DY Constructions Australia

Duration

xxx weeks

Delivery Method

Lump Sum

  • Office fitout in newly leased CBD space
  • Glazed and plasterboard partition installation
  • Operable wall relocation and reinstallation
  • Electrical and data upgrades for new layout
  • Patch painting and ceiling tile repairs
  • Site establishment and WHS compliance
  • Final clean and detailed project handover

Project overview

Interior fitout completed for Finstro’s new York Street office, featuring glazed partitions, operable wall relocation, and upgraded electrical layout.

Client Brief

Following a successful stripout and make good project at their previous tenancy, the client engaged DY Constructions to deliver a complete office fitout for their new workspace at Level 5, 1 York Street. The project involved demolition, relocation and make good works, new partitioning, painting, electrical, mechanical, and fire protection adjustments, along with the supply and installation of custom office furniture to suit the updated layout. A full set of construction drawings and CDC management services were also included to ensure code compliance.

Challenges

The project involved multiple moving parts including coordinating demolition, partition relocation, ceiling works and services adjustments—all within an operational CBD building. Managing the program while awaiting CDC documentation and ensuring timely coordination across trades presented minor logistical challenges.

The Solution

To minimise disruption, DY implemented protective barriers and floor coverings and carefully staged works to allow trades to progress efficiently without overlap. CDC coordination and all essential service adjustments were managed in-house, ensuring the project met both landlord and code requirements without delay. Regular site inspections and quality checks ensured a high standard of delivery throughout.

The Result

The client was pleased with the newly transformed office space, tailored to their layout needs and finished with modern, durable materials. DY delivered the full scope of works on time and in line with all compliance requirements, creating a practical, professional workspace that supported the client’s relocation and operational needs.

Get In Touch

Please Submit Your Enquiry and our friendly staff will contact you to arrange a free consultation at your premises to discuss your project in detail.

Scope of Works

  • Partition Works – Installation of full-height plasterboard and aluminium-framed glazed partitions to form meeting rooms, executive offices, and shared workspaces.

  • Doors & Hardware – Supply and installation of solid-core and glazed doors with compliant lever hardware, coordinated to match the new layout.

  • Operable Wall Relocation – Careful dismantling, relocation, and reinstallation of an existing operable wall to suit the revised floorplan.

  • Electrical & Data – Installation of power points, data outlets, and cable management to support the workstation layout, including IT coordination.

  • Coordination & Compliance – Site setup, floor protection, and WHS procedures. Liaison with building management and client vendors throughout the works.

  • Final Touches – Patch painting, ceiling tile adjustments, waste removal, and final commercial clean before handover.

Related Projects