Finstro
Sydney CBD, NSW

Make good and end of Lease Strip-Out project delivered by DY Constructions for Finstro

Project Details

Location

Sydney CBD, NSW

Industry

Financial Services

Size

250m2

Value

$330k

Designer

DY Constructions Australia

Duration

11 weeks

Delivery Method

Lump Sum

  • End of lease strip-out and make good
  • Removal of partitions, joinery, and cabling
  • Patch painting and wall repairs
  • Ceiling tile replacement and floor box capping
  • Compliance with landlord handback conditions
  • Final clean and waste removal
  • Works completed to base building standard

Project overview

End of lease make good completed for Finstro’s former Margaret Street tenancy, including full strip-out, patching, and reinstatement works.

Client Brief

Finstro engaged DY Constructions to undertake a comprehensive end-of-lease make good and strip-out of their office space at Margaret St, Sydney. The brief included the careful dismantling of partitions, walls, kitchen joinery, and reception counter, along with repairing ceilings and walls, repainting surfaces, removing existing floor coverings, and relocating furniture to support the tenant’s transition from the premises. The client required the space to be returned to base building condition in line with make good obligations and tight building management requirements.

Challenges

One of the main challenges of this project was completing a high volume of strip-out and make good works within an occupied CBD building, requiring strict coordination to avoid disruption to neighbouring tenancies. Additional complexity arose from the relocation and reuse of existing glass partitions and furniture, which had to be dismantled and installed without damage. Coordination with multiple trades and building management also required close oversight to avoid delays and maintain compliance with house rules.

The Solution

DY Constructions implemented temporary containment barriers, strict dust management protocols, and after-hours scheduling where required to minimise disruptions. All trades were coordinated under a single project management team to ensure smooth sequencing, and existing partitions and furniture were dismantled and reinstalled with precision to avoid unnecessary costs. Repairs to ceilings, walls, and floors were carried out using commercial-grade materials to match original finishes, ensuring a seamless final presentation.

The Result

DY Constructions successfully completed the strip-out and make good scope, allowing the client to vacate the premises on time and meet all building handover conditions. All surfaces were repainted, partitions removed, flooring reinstated, and the workspace restored to a clean, compliant state. The client was satisfied with the efficient turnaround, attention to detail, and ability to reuse materials sustainably.

Get In Touch

Please Submit Your Enquiry and our friendly staff will contact you to arrange a free consultation at your premises to discuss your project in detail.

Scope of Works

  • Demolition & Strip-Out – Removal of all non-base building partitions, doors, glass panels, joinery, redundant cables, and floor coverings.

  • Surface Restoration – Patching of wall penetrations, removal of fixings, and preparation of surfaces for repainting.

  • Ceiling & Flooring – Replacement of damaged or missing ceiling tiles and capping of any exposed floor boxes to comply with make good conditions.

  • Painting – Touch-up and patch painting to walls, doors, and frames to restore a uniform finish.

  • Waste Removal – Safe disposal of all strip-out materials, including soft furnishings, cables, and ceiling grid components.

  • Final Clean – Full commercial clean of all affected areas to return the space to base building condition in line with lease requirements.