Dhursan Construction
Oran Park, South West Sydney, NSW

Office fitout project delivered by DY Constructions for Dhursan Construction

Project Details

Location

Oran Park, South West Sydney, NSW

Industry

Construction

Size

180m2

Value

$50k

Designer

DY Constructions Australia

Duration

xxx weeks

Delivery Method

Lump Sum

  • Full office fitout with partitioned layout
  • Plasterboard and glazed partitions throughout
  • Curved plasterboard wall and glazed boardroom
  • Custom reception wall and finishes
  • Aluminium doors and compliant hardware
  • Electrical and data points for workstations
  • Acoustic-ready framing and layout
  • Coordination with base building requirements
  • Delivered in a newly built commercial tenancy

Project overview

Interior fitout completed for Dhursan Construction’s Oran Park office, featuring glazed partitions, reception wall, and acoustic-ready layout.

Client Brief

Dhursan Construction engaged DY Constructions to complete a detailed office partitioning project at their Oran Park premises. The scope of works involved the supply and installation of new office partitions, including a curved reception wall, aluminium framed glass doors (hinged and sliding), and supportive structures for wall-hung displays. DY also supplied and installed plasterboard walls with aqua-check for wet areas, safety strips for glazing, and progress cleaning throughout. A number of optional finishes, such as DecoPanel and Expresswood panelling, were also proposed for visual enhancement of the reception area.

Challenges

A key consideration was delivering a premium partitioning solution while navigating existing structural elements and ensuring full compliance with BCA and accessibility standards. Additional care was required around the curved reception wall, as well as coordinating design sign-off with the client.

The Solution

DY implemented a custom curved partition system using specialised curved steel tracks and framing to meet aesthetic goals while ensuring stability. To meet acoustic needs, options for plasterboard upgrades and insulation were proposed. All works were scheduled with minimal disruption, and full WHS protocols and quality control inspections were carried out throughout.

The Result

The project was completed to a high standard, with the client receiving a clean, modern workspace defined by sharp black-framed glass and clean plasterboard finishes. The new reception wall and internal partitioning enhanced both functionality and presentation, with all works delivered within budget and ready for occupation.

Get In Touch

Please Submit Your Enquiry and our friendly staff will contact you to arrange a free consultation at your premises to discuss your project in detail.

Scope of Works

  • Partition Works – Installation of full-height plasterboard partitions and aluminium-framed glazed walls to form reception, boardroom, workstations, colour studio, offices, and meeting spaces.

  • Doors & Hardware – Supply and installation of aluminium-framed glazed and solid-core doors with compliant lever hardware to meet AS1428 accessibility standards.

  • Reception Wall – Construction of a curved plasterboard wall with featured finishes and concealed junctions as per design documentation.

  • Electrical & Data – Provision of power and data points to suit the workstation layout, with allowance for floor chases and wall drops as required.

  • Acoustic Preparation – Partition design allowed for future acoustic treatment, with framing and layouts supporting sound insulation requirements.

  • Coordination & Compliance – Full BCA-compliant layout including corridor widths, door clearances, and fire egress. Coordination with landlord and certifier for code compliance.

  • Final Touches – Patch painting to new partitions and detailed clean on completion.