Interpro - Sydney Office
Sydney CBD, NSW

Office refurbishment project delivered by DY Constructions for Interpro Sydney office

Project Details

Location

Sydney CBD, NSW

Industry

Recruitment Agency

Size

150m2

Value

$120k

Designer

DY Constructions Australia

Duration

xxx weeks

Delivery Method

Lump Sum

  • Office refurbishment in Sydney CBD
  • Aluminium-framed glazed and solid partitions
  • Operable wall installation to meeting room
  • Kitchen joinery and splashback upgrades
  • Vinyl plank flooring and carpet patching
  • New skirting, wall painting and detailing
  • Works delivered in occupied tenancy
  • Final clean and staged handover

Project overview

Office refurbishment completed for Interpro Sydney on Kent Street, featuring partition upgrades, kitchen joinery and operable meeting room wall.

Client Brief

ProGroup Management engaged DY Constructions Australia to elevate the quality and functionality of their office environment and accommodate a growing team. The client sought a modern, well-planned fitout that would maximise workspace efficiency while enhancing overall presentation.

DY delivered a full-scope solution across two levels, including new office partitions, custom joinery, acoustic upgrades, flooring, furniture, lighting, and services. The works were tailored to support both day-to-day operations and future expansion.

Challenges

The client initially provided a floorplan that did not meet BCA and accessibility requirements, requiring DY to redesign the layout to ensure full compliance. As part of the brief to expand the office, the client also requested that the workspace extend into the existing warehouse—a complex adjustment that required careful consideration of mechanical systems and building code constraints.

Additionally, the client aimed to maximise workstation capacity within a limited footprint. DY had to carefully plan and adjust workstation placement to achieve optimal density without compromising usability or compliance, accommodating several design changes throughout the process.

The Solution

DY collaborated closely with a private certifier to review the client’s initial drawings, making iterative adjustments until the layout achieved full compliance and met the client’s functional needs. This ensured the final plan was both regulation-compliant and aligned with the intended use of the space.

For the office extension into the warehouse, DY coordinated layout modifications and installed a new air conditioning system to service the expanded area, ensuring the build met mechanical and BCA requirements. To address space constraints, DY carefully planned the workstation layout to maximise capacity without compromising movement, comfort, or compliance—successfully delivering a design that met the brief.

The Result

The project was completed to the client’s satisfaction, with DY securing the Occupation Certificate in time for ProGroup Management’s planned move-in. The final scope included full office partitioning, custom joinery, acoustic panels, flooring, lighting, electrical and data works, workstation installation, and new air conditioning for the expanded office area—delivered as a complete, compliant fitout solution.

Get In Touch

Please Submit Your Enquiry and our friendly staff will contact you to arrange a free consultation at your premises to discuss your project in detail.

Scope of Works

  • Partition Works – Supply and installation of new full-height plasterboard partitions and aluminium-framed glazed sections to reconfigure office and meeting spaces.

  • Operable Wall – Installation of a new operable wall system to create a flexible meeting room space, including support framing and interface finishes.

  • Doors & Hardware – Aluminium-framed glazed doors with compliant hardware to suit new office layout.

  • Joinery – New kitchen cabinetry, stone benchtop and tiled splashback installed in staff amenities area, including base cupboards and wall-mounted panels.

  • Flooring – Vinyl plank installation to kitchen and access zones, along with patching and re-stretching of existing carpet tiles where affected.

  • Painting & Skirting – Painting to new wall areas and replacement of skirtings as required across the refurbished zones.

  • Final Touches – Waste removal, progress cleaning, and detailed final clean before project handover.