Riverside Church
Greater Western Sydney, NSW

Church refurbishment project delivered by DY Constructions for Riverside Church

Project Details

Location

Minchinbury, Western Sydney, NSW

Industry

Community and Worship

Size

350m2

Value

$350k

Designer

DY Constructions Australia

Duration

6 weeks

Delivery Method

Lump Sum

  • Strip out of existing partitions, doors, and flooring

  • Full auditorium ceiling redesign and new lighting installation

  • Mechanical services upgrade including new air-conditioning system

  • Meeting room and reception area fitout

  • Bathroom refurbishment with modern fixtures and finishes

  • Stage re-build with new stage lighting and AV equipment

  • New partition layout, carpet tiles, and wall repaint

  • Security system installation with swipe access and CCTV

Project overview

Refurbishment of Riverside Church’s Ermington worship facility with modernised amenities, air-conditioning, and auditorium upgrades.

Client Brief

ProGroup Management engaged DY Constructions Australia to elevate the quality and functionality of their office environment and accommodate a growing team. The client sought a modern, well-planned fitout that would maximise workspace efficiency while enhancing overall presentation.

DY delivered a full-scope solution across two levels, including new office partitions, custom joinery, acoustic upgrades, flooring, furniture, lighting, and services. The works were tailored to support both day-to-day operations and future expansion.

Challenges

The client initially provided a floorplan that did not meet BCA and accessibility requirements, requiring DY to redesign the layout to ensure full compliance. As part of the brief to expand the office, the client also requested that the workspace extend into the existing warehouse—a complex adjustment that required careful consideration of mechanical systems and building code constraints.

Additionally, the client aimed to maximise workstation capacity within a limited footprint. DY had to carefully plan and adjust workstation placement to achieve optimal density without compromising usability or compliance, accommodating several design changes throughout the process.

The Solution

DY collaborated closely with a private certifier to review the client’s initial drawings, making iterative adjustments until the layout achieved full compliance and met the client’s functional needs. This ensured the final plan was both regulation-compliant and aligned with the intended use of the space.

For the office extension into the warehouse, DY coordinated layout modifications and installed a new air conditioning system to service the expanded area, ensuring the build met mechanical and BCA requirements. To address space constraints, DY carefully planned the workstation layout to maximise capacity without compromising movement, comfort, or compliance—successfully delivering a design that met the brief.

The Result

The project was completed to the client’s satisfaction, with DY securing the Occupation Certificate in time for ProGroup Management’s planned move-in. The final scope included full office partitioning, custom joinery, acoustic panels, flooring, lighting, electrical and data works, workstation installation, and new air conditioning for the expanded office area—delivered as a complete, compliant fitout solution.

Get In Touch

Please Submit Your Enquiry and our friendly staff will contact you to arrange a free consultation at your premises to discuss your project in detail.

Scope of Works

  • Internal Strip Out – Removal of existing partitions, doors, and flooring throughout selected areas to prepare for new layout and finishes.
  • Partitioning & Layout – New partition walls constructed to suit revised space plan including reception, meeting rooms, and amenities.
  • Mechanical Services – Installation of new air-conditioning systems across multiple areas to support comfort and energy efficiency.
  • Ceiling & Lighting – Full redesign of ceiling in auditorium and adjoining spaces; new lighting design and installation including feature stage lighting.
  • Joinery & Furniture – Supply and installation of meeting room joinery, storage, and reception furniture with modern finishes.
  • Bathroom Fitout – Refurbishment of bathrooms with tiling, sanitaryware, and custom feature wall detailing.
  • Stage & AV – Rebuilding of stage and installation of new audio-visual equipment, projector, and stage lighting system.
  • Security Upgrade – Integration of swipe card access and CCTV monitoring throughout facility for improved security.
  • Painting & Flooring – Repainting of walls and ceilings; installation of carpet tiles in meeting spaces and main auditorium.
  • Glazing Works – Installation of new shopfront glazing for entryway enhancement and increased natural light.