// Menu sub headings

1300 737 656

Call us now for your free site consultation. Specialising in Small, Medium and Large projects.

Vertiv
Eastern Creek, Western Sydney NSW

Warehouse stripout and make good project delivered by DY Constructions for Vertiv

Project Details

Location

Eastern Creek, Western Sydney NSW

Industry

Training and Employment Services

Size

xxxm2

Value

$90k

Designer

DY Constructions Australia

Duration

xxx weeks

Delivery Method

Lump Sum

  • End-of-lease warehouse stripout and make good
  • Decommissioning of offices and warehouse areas
  • Patch and paint to internal walls and ceilings
  • Removal of existing mechanical, electrical and data services
  • Roof repairs, skylight sealing, and base building works
  • Reinstatement of compliant emergency lighting
  • Final clean and make good to handover-ready standard

Project overview

Enhanced warehouse stripout and make good for global tech supplier Vertiv, including office decommissioning, repairs and end-of-lease works.

Client Brief

ProGroup Management engaged DY Constructions Australia to elevate the quality and functionality of their office environment and accommodate a growing team. The client sought a modern, well-planned fitout that would maximise workspace efficiency while enhancing overall presentation.

DY delivered a full-scope solution across two levels, including new office partitions, custom joinery, acoustic upgrades, flooring, furniture, lighting, and services. The works were tailored to support both day-to-day operations and future expansion.

Challenges

The client initially provided a floorplan that did not meet BCA and accessibility requirements, requiring DY to redesign the layout to ensure full compliance. As part of the brief to expand the office, the client also requested that the workspace extend into the existing warehouse—a complex adjustment that required careful consideration of mechanical systems and building code constraints.

Additionally, the client aimed to maximise workstation capacity within a limited footprint. DY had to carefully plan and adjust workstation placement to achieve optimal density without compromising usability or compliance, accommodating several design changes throughout the process.

The Solution

DY collaborated closely with a private certifier to review the client’s initial drawings, making iterative adjustments until the layout achieved full compliance and met the client’s functional needs. This ensured the final plan was both regulation-compliant and aligned with the intended use of the space.

For the office extension into the warehouse, DY coordinated layout modifications and installed a new air conditioning system to service the expanded area, ensuring the build met mechanical and BCA requirements. To address space constraints, DY carefully planned the workstation layout to maximise capacity without compromising movement, comfort, or compliance—successfully delivering a design that met the brief.

The Result

The project was completed to the client’s satisfaction, with DY securing the Occupation Certificate in time for ProGroup Management’s planned move-in. The final scope included full office partitioning, custom joinery, acoustic panels, flooring, lighting, electrical and data works, workstation installation, and new air conditioning for the expanded office area—delivered as a complete, compliant fitout solution.

Get In Touch

Please Submit Your Enquiry and our friendly staff will contact you to arrange a free consultation at your premises to discuss your project in detail.

Scope of Works

  • Make Good Works – Complete end-of-lease make good including removal of internal non-structural partitions, fittings, fixtures, and floor coverings. Works included the decommissioning of both warehouse and office areas.
  • Repairs & Reinstatement – Patch and paint to walls and ceilings, roof repairs, skylight resealing, and general repairs to return the building to original base condition.
  • Services Disconnection – Disconnection and removal of all electrical, data and mechanical services, including stripout of conduits, cabling, light fittings, and ceiling-mounted units.
  • Compliance & Safety – Reinstatement of emergency lighting and exit signage to base building standards; all works delivered in accordance with WHS requirements.
  • Finalisation & Clean – Site cleanup and detailed final clean to ensure the premises were left in handover-ready condition for end-of-lease obligations.

Related Projects