ASR Wealth Advisors
Sydney CBD, NSW

Office fitout project delivered by DY Constructions for ASR Wealth Advisors

Project Details

Location

Sydney CBD, NSW

Industry

Financial Services

Size

150m2

Value

$150k

Designer

DY Constructions Australia

Duration

xxx weeks

Delivery Method

Lump Sum

  • Office fitout within occupied CBD tenancy
  • Partitioned offices and glazed meeting rooms
  • Workstation relocation and power adjustments
  • Joinery modifications and carpet repairs
  • Electrical and data upgrades throughout
  • Patch painting and ceiling tile replacement
  • Works staged to minimise disruption
  • Final clean and coordinated handover

Project overview

Interior fitout completed for ASR Wealth Advisors in Sydney CBD, featuring partitioning, workstation relocation, and upgraded finishes.

Client Brief

ProGroup Management engaged DY Constructions Australia to elevate the quality and functionality of their office environment and accommodate a growing team. The client sought a modern, well-planned fitout that would maximise workspace efficiency while enhancing overall presentation.

DY delivered a full-scope solution across two levels, including new office partitions, custom joinery, acoustic upgrades, flooring, furniture, lighting, and services. The works were tailored to support both day-to-day operations and future expansion.

Challenges

The client initially provided a floorplan that did not meet BCA and accessibility requirements, requiring DY to redesign the layout to ensure full compliance. As part of the brief to expand the office, the client also requested that the workspace extend into the existing warehouse—a complex adjustment that required careful consideration of mechanical systems and building code constraints.

Additionally, the client aimed to maximise workstation capacity within a limited footprint. DY had to carefully plan and adjust workstation placement to achieve optimal density without compromising usability or compliance, accommodating several design changes throughout the process.

The Solution

DY collaborated closely with a private certifier to review the client’s initial drawings, making iterative adjustments until the layout achieved full compliance and met the client’s functional needs. This ensured the final plan was both regulation-compliant and aligned with the intended use of the space.

For the office extension into the warehouse, DY coordinated layout modifications and installed a new air conditioning system to service the expanded area, ensuring the build met mechanical and BCA requirements. To address space constraints, DY carefully planned the workstation layout to maximise capacity without compromising movement, comfort, or compliance—successfully delivering a design that met the brief.

The Result

The project was completed to the client’s satisfaction, with DY securing the Occupation Certificate in time for ProGroup Management’s planned move-in. The final scope included full office partitioning, custom joinery, acoustic panels, flooring, lighting, electrical and data works, workstation installation, and new air conditioning for the expanded office area—delivered as a complete, compliant fitout solution.

Get In Touch

Please Submit Your Enquiry and our friendly staff will contact you to arrange a free consultation at your premises to discuss your project in detail.

Scope of Works

  • Partition Works – Installation of full-height plasterboard partitions and aluminium-framed glazed walls to create new meeting rooms and enclosed offices.

  • Workstations & Joinery – Relocation of existing workstations with associated power and data reticulation; joinery modifications to suit reconfigured layout.

  • Electrical & Data – Upgrade of electrical and data services including new outlets, switch relocation, and power reconfiguration to support revised desk layout.

  • Finishes & Flooring – Patch painting to walls and skirtings; replacement of ceiling tiles and localised carpet repairs where affected by layout changes.

  • Coordination & Staging – Works delivered in a live office environment, staged to reduce operational impact and maintain business continuity.

  • Final Touches – Final detailing, debris removal, and professional clean prior to client handover.