// Menu sub headings

1300 737 656

Call us now for your free site consultation. Specialising in Small, Medium and Large projects.

Fresh Produce Group
Wetherill Park, Western Sydney NSW

Office fitout project delivered by DY Constructions for Fresh Produce Group

Project Details

Location

Wetherill Park, Western Sydney NSW

Industry

Fresh Food Supply Chain

Size

170m2

Value

$150k

Designer

DY Constructions Australia

Duration

xxx weeks

Delivery Method

Lump Sum

  • Office fitout works including layout alterations and new partitions
  • Epoxy flooring installation for durability and easy maintenance
  • Amenities refurbishment, including toilet and shower works
  • Acoustic partitioning with insulation for sound attenuation
  • New lighting including LED battens and emergency lighting upgrades
  • Installation of weatherproof awning and external protection works
  • Electrical and data works with new GPOs and cabling
  • Joinery upgrades to kitchen and staff amenity areas

Project overview

Office fitout completed for Fresh Produce Group in Wetherill Park, with epoxy flooring, amenities upgrade, acoustic partitions and external awning works.

Client Brief

ProGroup Management engaged DY Constructions Australia to elevate the quality and functionality of their office environment and accommodate a growing team. The client sought a modern, well-planned fitout that would maximise workspace efficiency while enhancing overall presentation.

DY delivered a full-scope solution across two levels, including new office partitions, custom joinery, acoustic upgrades, flooring, furniture, lighting, and services. The works were tailored to support both day-to-day operations and future expansion.

Challenges

The client initially provided a floorplan that did not meet BCA and accessibility requirements, requiring DY to redesign the layout to ensure full compliance. As part of the brief to expand the office, the client also requested that the workspace extend into the existing warehouse—a complex adjustment that required careful consideration of mechanical systems and building code constraints.

Additionally, the client aimed to maximise workstation capacity within a limited footprint. DY had to carefully plan and adjust workstation placement to achieve optimal density without compromising usability or compliance, accommodating several design changes throughout the process.

The Solution

DY collaborated closely with a private certifier to review the client’s initial drawings, making iterative adjustments until the layout achieved full compliance and met the client’s functional needs. This ensured the final plan was both regulation-compliant and aligned with the intended use of the space.

For the office extension into the warehouse, DY coordinated layout modifications and installed a new air conditioning system to service the expanded area, ensuring the build met mechanical and BCA requirements. To address space constraints, DY carefully planned the workstation layout to maximise capacity without compromising movement, comfort, or compliance—successfully delivering a design that met the brief.

The Result

The project was completed to the client’s satisfaction, with DY securing the Occupation Certificate in time for ProGroup Management’s planned move-in. The final scope included full office partitioning, custom joinery, acoustic panels, flooring, lighting, electrical and data works, workstation installation, and new air conditioning for the expanded office area—delivered as a complete, compliant fitout solution.

Get In Touch

Please Submit Your Enquiry and our friendly staff will contact you to arrange a free consultation at your premises to discuss your project in detail.

Scope of Works

  • Internal Works – Supply and installation of new acoustic partitions with insulation; office layout reconfiguration to suit new workstation arrangement.
  • Flooring – Full epoxy coating to amenities and warehouse entry areas for improved durability and easy cleaning.
  • Lighting & Electrical – Installation of new LED batten lights, emergency lighting, and new general power outlets (GPOs) throughout the office and amenities.
  • Amenities Upgrade – Refurbishment of existing male/female bathrooms and shower facilities, including fittings, fixtures, tiling, and plumbing modifications.
  • Kitchen & Joinery – Supply and installation of new kitchen joinery, including sink, benchtops, and appliance provisions for staff break areas.
  • External Works – Installation of new weatherproof awning at external entry, including framing, polycarbonate roofing and stormwater connection.
  • Data & Communications – New Cat 6 data cabling, patch panel and termination points installed throughout the upgraded office area.

Related Projects