Office fitout project delivered by DY Constructions for MTC Australia Burwood

Project Details

Location

Burwood, Inner West Sydney, NSW

Industry

Training and Employment Services

Size

150m2

Value

$60k

Designer

DY Constructions Australia

Duration

xxx weeks

Delivery Method

Lump Sum

  • New layout and wall partitioning
  • Full-height walls to ceiling slab
  • Fire services upgrades and coordination
  • Electrical and data service adjustments
  • Optional acoustic insulation provisions
  • Painting of exposed ceilings and walls
  • Works completed to meet lease and BCA compliance

Project overview

Interior fitout completed for MTC Australia’s Burwood site, featuring new layout, ceiling-height partitions, fire compliance upgrades and acoustic insulation options.

Client Brief

ProGroup Management engaged DY Constructions Australia to elevate the quality and functionality of their office environment and accommodate a growing team. The client sought a modern, well-planned fitout that would maximise workspace efficiency while enhancing overall presentation.

DY delivered a full-scope solution across two levels, including new office partitions, custom joinery, acoustic upgrades, flooring, furniture, lighting, and services. The works were tailored to support both day-to-day operations and future expansion.

Challenges

The client initially provided a floorplan that did not meet BCA and accessibility requirements, requiring DY to redesign the layout to ensure full compliance. As part of the brief to expand the office, the client also requested that the workspace extend into the existing warehouse—a complex adjustment that required careful consideration of mechanical systems and building code constraints.

Additionally, the client aimed to maximise workstation capacity within a limited footprint. DY had to carefully plan and adjust workstation placement to achieve optimal density without compromising usability or compliance, accommodating several design changes throughout the process.

The Solution

DY collaborated closely with a private certifier to review the client’s initial drawings, making iterative adjustments until the layout achieved full compliance and met the client’s functional needs. This ensured the final plan was both regulation-compliant and aligned with the intended use of the space.

For the office extension into the warehouse, DY coordinated layout modifications and installed a new air conditioning system to service the expanded area, ensuring the build met mechanical and BCA requirements. To address space constraints, DY carefully planned the workstation layout to maximise capacity without compromising movement, comfort, or compliance—successfully delivering a design that met the brief.

The Result

The project was completed to the client’s satisfaction, with DY securing the Occupation Certificate in time for ProGroup Management’s planned move-in. The final scope included full office partitioning, custom joinery, acoustic panels, flooring, lighting, electrical and data works, workstation installation, and new air conditioning for the expanded office area—delivered as a complete, compliant fitout solution.

Get In Touch

Please Submit Your Enquiry and our friendly staff will contact you to arrange a free consultation at your premises to discuss your project in detail.

Scope of Works

  • Partitioning Works – Construction of new full-height plasterboard partitions to suit revised office layout, including walls extending to the ceiling slab.
  • Fire Protection – Adjustment of existing fire services layout including sprinklers and detection devices to align with new partitions and accessways.
  • Electrical & Data – Rerouting and adjustment of existing power and data outlets to suit the new floor plan and workstation layout.
  • Acoustic Options – Allowance for optional acoustic insulation to improve sound separation between meeting rooms and shared spaces.
  • Painting & Finishes – Application of paint to all new walls and exposed ceilings, coordinated to suit the tenancy’s upgraded interior.
  • Compliance & Coordination – Coordination with landlord and certifier to ensure all works met lease terms and compliance with applicable BCA standards.