Project Details
Location
South Western Sydney, NSW
Industry
Education and Highschool
Size
25m2
Value
$50k
Designer
DY Constructions Australia
Duration
3 weeks
Delivery Method
Lump Sum
- Staff kitchen and breakout refurbishment within a live school environment
- Removal of existing joinery and fixtures
- Installation of new custom kitchen joinery
- Custom pigeonhole storage units
- Banquet seating to breakout area
- New vinyl plank flooring installation
- Internal repaint to walls and door
- Replacement of window blinds
- Plumbing upgrades for new kitchen layout
- Final clean, quality checks, and handover
Project overview
Staff kitchen and breakout refurbishment completed for All Saints Grammar, featuring custom joinery, banquet seating, new flooring, and upgraded finishes.
Client Brief
All Saints Grammar engaged DY Constructions Australia to deliver a refurbishment of the staff kitchen and breakout area within their secondary campus. The brief focused on replacing outdated joinery and finishes with a more functional and modern space, including new kitchen facilities, seating, and storage, while ensuring the works were carried out safely within an operational school environment.
Challenges
Delivering the refurbishment within an active school environment required careful planning to ensure minimal disruption to staff and daily operations. The works also involved the removal of existing joinery and finishes, requiring coordination across trades to maintain programme efficiency and ensure the new kitchen layout aligned with existing services.
The Solution
DY implemented a structured delivery approach, coordinating trades to complete strip out, joinery installation, flooring, painting, and plumbing works in a logical sequence. Careful planning and site management ensured the works were carried out safely, while maintaining quality control and minimising disruption to the surrounding school environment.
The Result
The completed refurbishment delivered a modernised staff kitchen and breakout space, featuring new joinery, seating, and upgraded finishes that improved both functionality and comfort. The project was completed to a high standard with a clean handover, providing staff with a refreshed and practical environment for daily use.