// Menu sub headings

1300 737 656

Call us now for your free site consultation. Specialising in Small, Medium and Large projects.

All Saints Grammar School
South Western Sydney, NSW

Educational staff room refurbishment delivered by DY Constructions for All Saints Grammar School

Project Details

Location

South Western Sydney, NSW

Industry

Education and Highschool

Size

25m2

Value

$50k

Designer

DY Constructions Australia

Duration

3 weeks

Delivery Method

Lump Sum

  • Staff kitchen and breakout refurbishment within a live school environment
  • Removal of existing joinery and fixtures
  • Installation of new custom kitchen joinery
  • Custom pigeonhole storage units
  • Banquet seating to breakout area
  • New vinyl plank flooring installation
  • Internal repaint to walls and door
  • Replacement of window blinds
  • Plumbing upgrades for new kitchen layout
  • Final clean, quality checks, and handover

Project overview

Staff kitchen and breakout refurbishment completed for All Saints Grammar, featuring custom joinery, banquet seating, new flooring, and upgraded finishes.

Client Brief

All Saints Grammar engaged DY Constructions Australia to deliver a refurbishment of the staff kitchen and breakout area within their secondary campus. The brief focused on replacing outdated joinery and finishes with a more functional and modern space, including new kitchen facilities, seating, and storage, while ensuring the works were carried out safely within an operational school environment.

Challenges

Delivering the refurbishment within an active school environment required careful planning to ensure minimal disruption to staff and daily operations. The works also involved the removal of existing joinery and finishes, requiring coordination across trades to maintain programme efficiency and ensure the new kitchen layout aligned with existing services.

The Solution

DY implemented a structured delivery approach, coordinating trades to complete strip out, joinery installation, flooring, painting, and plumbing works in a logical sequence. Careful planning and site management ensured the works were carried out safely, while maintaining quality control and minimising disruption to the surrounding school environment.

The Result

The completed refurbishment delivered a modernised staff kitchen and breakout space, featuring new joinery, seating, and upgraded finishes that improved both functionality and comfort. The project was completed to a high standard with a clean handover, providing staff with a refreshed and practical environment for daily use.

Get In Touch

Please Submit Your Enquiry and our friendly staff will contact you to arrange a free consultation at your premises to discuss your project in detail.

Scope of Works

  • Strip Out Works – Removal of existing kitchen joinery, splashback, furniture, and wall fixtures to prepare the space for refurbishment.
  • Joinery & Fixtures – Supply and installation of new custom kitchen joinery, including cabinetry, benchtops, splashback, pigeonhole storage, and banquet seating.
  • Floor Finishes – Preparation of existing substrate and installation of new commercial-grade vinyl plank flooring to the staff kitchen and breakout area.
  • Painting – Repairs and repainting of existing walls and door to refresh the internal space.
  • Window Furnishings – Replacement of existing blinds with new roller blind to suit the upgraded space.
  • Plumbing Works – Modification and reconnection of services, including installation of new sink, tapware, and dishwasher.

Related Projects