// Menu sub headings

1300 737 656

Call us now for your free site consultation. Specialising in Small, Medium and Large projects.

Interpro - Brisbane Office
Brisbane CBD, QLD

Office fitout project delivered by DY Constructions for Interpro Brisbane office

Project Details

Location

Brisbane CBD, QLD

Industry

Recruitment Agency

Size

150m2

Value

$60k

Designer

DY Constructions Australia

Duration

xxx weeks

Delivery Method

Lump Sum

  • Office fitout in occupied Brisbane CBD tenancy
  • Glazed and solid partition installation
  • Operable wall system to meeting area
  • Kitchen joinery and tiled splashback
  • Timber-look vinyl flooring throughout
  • Electrical and data outlet provisions
  • Compliant hardware and access clearances
  • Final clean and project handover

Project overview

Interior fitout completed for Interpro Brisbane, featuring glazed partitions, operable wall, kitchen joinery and timber-look flooring.

Client Brief

ProGroup Management engaged DY Constructions Australia to elevate the quality and functionality of their office environment and accommodate a growing team. The client sought a modern, well-planned fitout that would maximise workspace efficiency while enhancing overall presentation.

DY delivered a full-scope solution across two levels, including new office partitions, custom joinery, acoustic upgrades, flooring, furniture, lighting, and services. The works were tailored to support both day-to-day operations and future expansion.

Challenges

The client initially provided a floorplan that did not meet BCA and accessibility requirements, requiring DY to redesign the layout to ensure full compliance. As part of the brief to expand the office, the client also requested that the workspace extend into the existing warehouse—a complex adjustment that required careful consideration of mechanical systems and building code constraints.

Additionally, the client aimed to maximise workstation capacity within a limited footprint. DY had to carefully plan and adjust workstation placement to achieve optimal density without compromising usability or compliance, accommodating several design changes throughout the process.

The Solution

DY collaborated closely with a private certifier to review the client’s initial drawings, making iterative adjustments until the layout achieved full compliance and met the client’s functional needs. This ensured the final plan was both regulation-compliant and aligned with the intended use of the space.

For the office extension into the warehouse, DY coordinated layout modifications and installed a new air conditioning system to service the expanded area, ensuring the build met mechanical and BCA requirements. To address space constraints, DY carefully planned the workstation layout to maximise capacity without compromising movement, comfort, or compliance—successfully delivering a design that met the brief.

The Result

The project was completed to the client’s satisfaction, with DY securing the Occupation Certificate in time for ProGroup Management’s planned move-in. The final scope included full office partitioning, custom joinery, acoustic panels, flooring, lighting, electrical and data works, workstation installation, and new air conditioning for the expanded office area—delivered as a complete, compliant fitout solution.

Get In Touch

Please Submit Your Enquiry and our friendly staff will contact you to arrange a free consultation at your premises to discuss your project in detail.

Scope of Works

  • Partition Works – Installation of full-height plasterboard and aluminium-framed glazed partitions to divide office, meeting, and kitchen areas.

  • Operable Wall – Supply and installation of an operable wall system to allow flexible use of the boardroom space.

  • Doors & Hardware – Aluminium-framed glazed doors and solid core doors installed throughout, complete with compliant lever hardware and privacy locks.

  • Joinery – New kitchen cabinetry including laminated benchtops, splashback tiling, and base/wall cupboards with appliance provisions.

  • Flooring – Installation of timber-look vinyl plank flooring throughout the tenancy, including careful preparation of the subfloor.

  • Electrical & Data – Provision of new GPOs and data points to support the new layout and relocated workstations.

  • Final Touches – Detailed clean, removal of protection materials, and project handover to the client.

Related Projects