Project Details

  • Full commercial office fitout
  • Flood recovery and refurbishment
  • New breakout and kitchen
  • Custom joinery and finishes
  • Frameless glazed partitioning
  • Upgraded mechanical systems
  • New roofing installation
  • Asbestos removal and testing
  • Contemporary loose furniture
  • Staged project delivery

Project overview

A comprehensive multi-stage office fitout and site upgrade delivered for Pentair across their Western Sydney facility — including office refurbishment, warehouse modifications, structural upgrades and amenities enhancements.

Client Brief

Pentair engaged DY Constructions Australia to complete a comprehensive building refurbishment and office fitout following flood-related damage at their Milperra facility.

The scope included upgrades to office spaces, meeting rooms, amenities, and shared areas to improve functionality and presentation. As part of the works, DY also replaced sections of the existing metal roofing to address ongoing water ingress issues and ensure the building was fully water-tight. The project focused on revitalising the workplace while enhancing the overall resilience and compliance of the facility.

Challenges

The existing building required major upgrades to improve performance and ensure long-term durability, particularly in the event of future flooding. Asbestos was identified throughout various areas, requiring detailed testing, safe removal, and compliance with health regulations. The ageing mechanical systems, including air conditioning, also had to be replaced to meet current standards. The leaking roof needed full replacement to make the building watertight. Due to the scale of the works, the project was delivered in stages and involved multiple design revisions and planning adjustments to align with the client’s evolving needs.

The Solution

DY Constructions worked closely with the client to plan and deliver each stage of the project effectively. Experienced subcontractors were engaged to ensure quality across all trades. Asbestos was safely identified and removed in accordance with regulatory requirements. The old roof was replaced to resolve ongoing water ingress, and a new mechanical system was designed and installed to replace outdated infrastructure. A structural wall identified as unstable was also reinforced. Throughout the process, numerous underlying issues were uncovered and resolved to bring the building up to a safe, modern standard.

The Result

DY Constructions successfully delivered a staged refurbishment and fitout that transformed the Pentair facility into a safe, modern, and functional workplace. The completed works included new office and meeting spaces, custom joinery, upgraded amenities, compliant mechanical systems, and refreshed finishes throughout. The new metal roof resolved long-standing leaks, while structural improvements and asbestos removal ensured a safer environment for occupants.

The project not only restored the building after flood damage but also improved its overall condition, bringing it up to code and enhancing resilience against future natural disasters. The facility is now fully compliant, water-tight, and safely reoccupied for day-to-day operations.

Get In Touch

Please Submit Your Enquiry and our friendly staff will contact you to arrange a free consultation at your premises to discuss your project in detail.

Scope of Works

  • Site Preparation: COVID-19 safety compliance, site establishment, floor protection, and material delivery logistics.

  • Demolition & Structural Works: Removal of damaged partitions, ceilings, and fixtures; make-good works throughout; rectification of unstable structural wall sections.

  • Partitioning & Ceilings: Installation of full-height plasterboard and acoustic glass partitions; suspended grid ceilings with ceiling tile replacement.

  • Flooring & Finishes: New carpet tiles and vinyl planks; patching and painting of new and existing walls, doors, and ceilings.

  • Joinery & Furniture: Custom kitchen joinery, utility storage units, lounge cabinetry, and full loose furniture supply and installation.

  • Electrical & HVAC: Complete rewiring, new power/data points, LED lighting upgrades, new switchboards, and installation of air conditioning systems.

  • Plumbing & Amenities: Full toilet refurbishment with new partitions, fittings, tiling, waterproofing, and plumbing services.

  • Fire Protection: Smoke alarm installation and compliance updates in line with the latest Annual Fire Safety Statement (AFSS).

  • Metal Roofing: Removal and replacement of deteriorated metal roofing to resolve leaks and provide long-term weatherproofing.

  • Bollards Installation: Supply and install of safety bollards to external zones for vehicle impact protection and compliance.

  • Project Management: Comprehensive project supervision, site meetings, trade coordination, quality control, and staged delivery.