1300 737 656

Call us now for your free site consultation. Specialising in Small, Medium and Large projects.

Acciona Constructions Australia
Harrington Street, Sydney CBD, NSW

Office fitout, strip out & make good delivered by DY Constructions for Acciona Constructions Australia

Project Details

Location

Harrington Street, Sydney CBD, NSW

Industry

Sustainable Infrastructure Solutions

Size

1000m2

Value

$200k

Designer

XXX

Duration

5 weeks

Delivery Method

Lump Sum

  • Office partition and layout modifications
  • Custom L-shaped reception joinery
  • Locker-integrated cabinetry and signage wall
  • Floor protection and dust containment
  • Patch painting and ceiling tile replacements
  • End-of-lease strip out and make good
  • Worksite done in a heritage building
  • After-hours and staged works
  • Removal of waste and progress cleaning
  • Full project and site management

Project overview

Office fitout, strip out and make good delivered by DY Constructions for Acciona on Harrington Street, CBD, Sydney.

Client Brief

Acciona, a repeat client, engaged DY Constructions Australia to deliver a comprehensive office fitout at their new Harrington Street premises. The project included the construction of meeting rooms, boardrooms, quiet rooms, and the installation of custom-built reception joinery tailored to the company’s design and storage needs.

As the building is heritage-listed, DY applied careful planning and fitout methods to protect original architectural elements. DY also supported the client in coordinating BCA consulting certification, ensuring all works were compliant and appropriately documented for occupancy and regulatory approval.

Challenges

The project operated under a tight timeframe, requiring efficient coordination to meet the client’s relocation schedule. Midway through the fitout, the client issued design changes, which required DY to swiftly manage redraws, redesigns, and re-sequencing of the construction program to minimise delays.

Working within a heritage-listed building added complexity, particularly around the installation of new partitions. DY had to ensure all works complied with strict council guidelines, using non-invasive methods and carefully coordinated detailing to preserve the building’s original structure and finishes.

The Solution

DY managed the tight timeframe through structured scheduling, organised coordination, and a trusted network of subcontractors to keep works moving efficiently. When the client introduced design changes mid-fitout, DY held review meetings, revised documentation, and adjusted the program to fast-track delivery without compromising quality.

To meet heritage compliance, DY worked closely with a private certifier, ensuring all works were non-invasive and carefully built around original timber elements to preserve the integrity of the building.

The Result

Acciona moved into their new office on the targeted date, with the fitout completed to their full satisfaction. The client was particularly pleased with the quality of finishes, the smooth delivery under pressure, and DY’s responsiveness throughout the project. They later provided a written testimonial commending DY’s professionalism and attention to detail.

The scope included construction of new meeting rooms, quiet rooms, and collaborative areas, along with custom reception joinery and detailed partitioning throughout. All works were carried out with sensitivity to the building’s heritage features, resulting in a functional and refined corporate environment.

Client Testimonial

TO WHOM IT MAY CONCERN,

We had the pleasure of working with DY Constructions Australia Pty Ltd for the fit-out of our new corporate office in Sydney, and we couldn’t be happier with the results.

A special mention to Mark, who went above and beyond with his professionalism, attention to detail, and ability to stay on top of every aspect of the project. His dedication ensured that everything was completed to the highest standard, and he made the entire process run smoothly from start to finish.

The DYCA team was consistently responsive and proactive, delivering quality work at every stage. We truly appreciated their commitment and would highly recommend them for any future projects.

If you’re considering a fit-out, we couldn’t recommend them more – they truly stand out from the crowd!

Maria Guerola Martinez
Architect | Acciona Engineering and Design

Get In Touch

Please Submit Your Enquiry and our friendly staff will contact you to arrange a free consultation at your premises to discuss your project in detail.

Scope of Works

  • Site Preparation – Setup of containment barriers and heavy-duty plastic floor protection. Preparation of a worksite within a heritage-listed building, including WHS management, site inductions, and delivery coordination.

  • Reception Joinery – Supply and installation of custom-made L-shaped reception counter with melamine finishes, integrated storage, cable management, and a signage wall with locker void.

  • Partition Works – Installation of new full-height plasterboard and glass partitions with custom doors, bulkheads, and skirtings. All works compliant with accessibility and BCA requirements.

  • Strip Out & Make Good – Dismantling of joinery, removal of partitions, patching and painting of walls, make good to ceilings and carpet tiles using spare materials, all completed out-of-hours.

  • Painting & Finishes – Patch painting to match existing finishes and full painting of new partitions and doors.

  • Waste Removal & Cleaning – Ongoing progress cleaning during works and a final detailed clean before handover, including debris removal and surface polishing.

  • Project Management – Full site coordination, trade scheduling, quality control, and stakeholder communication throughout each project stage.

Related Projects