1300 737 656

Call us now for your free site consultation. Specialising in Small, Medium and Large projects.

Sydney Strata Services
Inner West Sydney, NSW

Commercial gym fitout delivered by DY Constructions for Sydney Strata Services

Project Details

Location

Inner West Sydney, NSW

Industry

Strata Committee

Size

85m2

Value

$55k

Designer

DY Constructions Australia

Duration

4 weeks

Delivery Method

Lump Sum

  • Strata gym refurbishment
  • New rubber flooring
  • Mirror and feature wall install
  • Updated equipment layout
  • Electrical and lighting upgrades
  • Acoustic treatments
  • Painting and cosmetic works
  • Coordination with building management
  • Works in occupied building
  • Tight program delivery

Project overview

Strata Gym Refurbishment for Sydney Strata Services in Sydney’s Inner West.

Client Brief

Sydney Strata Services engaged DY Constructions Australia to refurbish their ageing commercial gym facility located within a residential strata complex. As a repeat client, they sought a full-scope fitout to modernise the space and improve the amenity for residents.

DY worked closely with the client’s nominated gym equipment suppliers to coordinate layout and services upgrades. The works included new rubber flooring, mirror and feature wall installations, acoustic treatments, and electrical enhancements to deliver a refreshed, functional gym environment.

Challenges

The project operated on a fast-tracked program to minimise gym downtime and restore access for residents as quickly as possible. Strict building management protocols had to be followed, requiring clear communication and coordination throughout the works. Plumbing modifications and the installation of new ceiling-suspended TVs also posed challenges, necessitating careful ceiling access and structural planning within an existing building fabric.

 
The Solution

DY implemented a structured and efficient program to meet the project’s fast turnaround, coordinating works through detailed scheduling and relying on a network of experienced subcontractors to maintain quality under time constraints. Clear communication between trades ensured tasks were completed in sequence, reducing delays and allowing the gym to reopen on time.

To meet building management requirements, DY adhered strictly to compliance protocols and maintained ongoing liaison with stakeholders throughout the works. For the installation of suspended TVs, DY opened sections of the existing ceiling and installed structural bracing to support the new units. Mobile scaffolding was used to safely access ceiling areas, with all works conducted in line with safety standards and strata building guidelines.

The Result

The project was delivered to the full satisfaction of the strata committee, who praised the refreshed look and improved functionality of the gym. Usage of the facility increased following the refurbishment, and the upgrade contributed to the overall value of the building. The scope included new rubber flooring, acoustic panels, mirrored feature walls, reconfigured equipment layout, and suspended TV installations—transforming the outdated gym into a modern, well-equipped space. Pleased with the outcome, the client has since engaged DY for further works within the complex.

Get In Touch

Please Submit Your Enquiry and our friendly staff will contact you to arrange a free consultation at your premises to discuss your project in detail.

Scope of Works

  • Demolition & Preparation – Removal of existing flooring, fixtures, and fittings in preparation for refurbishment works.
  • Flooring Installation – Supply and install new rubber gym flooring across workout zones.
  • Wall Treatments – Installation of large wall mirrors and feature panels to enhance interior aesthetics.
  • Electrical Works – New power points, lighting, and electrical upgrades to suit equipment layout.
  • Acoustic Solutions – Installation of acoustic panels to reduce sound transfer and echo.
  • Painting & Finishes – Full repaint of internal walls and surfaces for a refreshed look.
  • Layout Reconfiguration – Coordination of gym equipment layout to improve functionality and flow.
  • Final Works – Detail clean, compliance check, and handover for immediate gym use.

Related Projects