1300 737 656

Call us now for your free site consultation. Specialising in Small, Medium and Large projects.

Sydney Strata Services
Inner West Sydney, NSW

Commercial gym fitout delivered by DY Constructions for Sydney Strata Services

Project Details

Location

Inner West Sydney, NSW

Industry

Strata Committee

Size

100m2

Value

$125k

Designer

DY Constructions Australia

Duration

4 weeks

Delivery Method

Lump Sum

  • Refurbishment of multiple bathrooms and tea rooms
  • Demolition and make good works
  • Waterproofing and new tiling throughout
  • Custom joinery installation
  • Plumbing upgrades and PC item install
  • Electrical and lighting modifications
  • Ceiling tile and plasterboard repairs
  • Patch painting of doors and walls
  • Progress and detailed final cleaning
  • Staged works in live strata environment

Project overview

Bathroom and Amenity Upgrades for Sydney Strata Services, Inner West Sydney.

Client Brief

Sydney Strata Services engaged DY Constructions Australia to upgrade the commercial bathroom and amenity areas within their strata complex. The client aimed to elevate the standard of shared facilities used by tenants, visitors, and patrons of nearby cafés and restaurants, enhancing the overall appeal and functionality of the commercial precinct.

The project involved a full-scope refurbishment including demolition, waterproofing, custom joinery, new tiling, plumbing and electrical upgrades, and final detailed cleaning across multiple bathrooms, shower rooms, and tea points. DY was tasked with delivering a modern, durable, and visually improved amenity space to meet daily usage demands.

Challenges

The amenity areas serviced high-traffic commercial tenancies, including cafés and restaurants, which meant the project had to be delivered under a tight timeframe to minimise disruption. All noisy works were subject to building management restrictions and had to be scheduled in consultation with the strata committee.

In addition, all fixtures, finishes, and colour selections required committee approval. DY worked closely with the client’s interior designer throughout the process to ensure all selections met aesthetic expectations while aligning with strata requirements.

The Solution

DY obtained all necessary building management approvals in advance and developed a staged construction plan to align with access restrictions and minimise disruption to commercial tenants. Works were carefully scheduled around quiet periods, with noisy activities coordinated in consultation with the strata committee to ensure compliance with building protocols.

Throughout the project, DY collaborated closely with the client’s interior designer to finalise fixtures, finishes, and colours, ensuring full approval was obtained from the strata committee prior to installation. This proactive and organised approach allowed the team to deliver the refurbishment within the required timeframe while maintaining high quality and compliance standards.

The Result

The project was completed to the satisfaction of the strata committee, who were pleased with the improved appearance and functionality of the amenity spaces. The upgraded bathrooms now provide a clean, modern environment for staff and patrons of surrounding cafés and restaurants, enhancing the overall standard of the commercial premises.

The scope included demolition, waterproofing, new floor and skirting tiles, custom joinery, plumbing and electrical upgrades, and final detailing across multiple bathrooms, shower rooms, and tea points. The result is a refreshed and professional amenity offering that aligns with the client’s long-term goals for the building.

Get In Touch

Please Submit Your Enquiry and our friendly staff will contact you to arrange a free consultation at your premises to discuss your project in detail.

Scope of Works

  • Demolition & Site Preparation – Removal of existing joinery, floor tiles, damaged ceiling tiles, and associated fixtures in bathrooms and tea rooms.
  • Waterproofing & Tiling – Application of new waterproofing membranes and installation of client-supplied floor, skirting, and splashback tiles.
  • Joinery Installation – Supply and installation of custom vanities, overhead cabinets, partitions, and shower benches across all amenities.
  • Electrical Works – Disconnection and reconnection of lighting, power points, and emergency fittings; installation of new LED downlights and power to auto taps.
  • Plumbing Works – Disconnection and reconnection of toilets, basins, urinals, and tea point sinks; installation of client-supplied fixtures and accessories.
  • Ceiling & Painting – Make good to plasterboard ceilings, paint walls, doors, and repair areas impacted by demolition.
  • Cleaning & Final Presentation – Progress cleaning during works and detailed commercial clean prior to handover, including mirrors, tiles, and cabinetry.
  • Project Management – Coordination of all trades, site supervision, WHS compliance, and stakeholder communication throughout the project.

Related Projects