Ringmer
Artarmon, North Shore Sydney, NSW

Ringmer - Stip Out and Make Good project delivered by DY Constructions.

Project Details

  • Two-unit project delivered simultaneously
  • Warehouse and commercial office stripout
  • Commercial bathroom refurbishments
  • Asset repositioning works
  • Epoxy flooring restoration
  • New carpet tile installation
  • Ceiling grid and lighting reinstatement
  • Fire and mechanical system adjustments
  • Electrical and plumbing disconnection
  • Make good to base building standard

Project overview

Comprehensive Make Good & Stripout Works Across Dual Units for Ringmer.

Client Brief

Ringmer engaged DY Constructions to deliver simultaneous make good and refurbishment works across two adjoining tenancies in Artarmon. One unit required timely completion to accommodate an incoming tenant, while the second needed a full internal upgrade to enhance market appeal for lease. The goal was to return both spaces to base building condition with modernised finishes and essential service adjustments to align with current leasing standards. DY was also tasked with ensuring both projects were delivered concurrently to meet the client’s broader asset repositioning strategy.

Challenges

The project was delivered during the end-of-year holiday period, a time of limited trade availability and increased scheduling complexity. One key challenge was the client’s request to replace the existing façade wall with a glazed partition system to create a street-facing shopfront, requiring the ground floor showroom to be both functional and visually appealing. During construction, significant water damage was discovered behind an existing shower in one of the bathrooms, requiring urgent rectification and rework. These issues demanded flexibility, quick decision-making, and careful coordination to stay on program.

The Solution

DY Constructions implemented detailed planning and scheduling to manage trades and maintain progress during the busy holiday period. Reliable subcontractors and strong project management were critical to navigating program challenges. For the showroom’s new glazed shopfront, DY coordinated demolition works and installed temporary hoarding to secure the site while adjusting the internal floor level for a seamless finish. When unexpected water damage was discovered behind the shower, works were paused to conduct investigations, obtain client approvals, and carry out the necessary remediation—ensuring long-term integrity and compliance of the refurbishment.

The Result

DY Constructions successfully completed the simultaneous refurbishment and make good works for both tenancies, allowing one unit to be handed over to an incoming tenant and the other to be repositioned for lease. The works included demolition, new glazed shopfront installation, commercial bathroom refurbishment, epoxy flooring, new carpet tiles, and reinstatement of base building services. The new showroom offered strong street appeal, contributing to the uplift of the wider business park. Coordinating both units at once saved the client time and money. Satisfied with the delivery and outcome, the client has since engaged DY Constructions for further projects.

Get In Touch

Please Submit Your Enquiry and our friendly staff will contact you to arrange a free consultation at your premises to discuss your project in detail.

Scope of Works

  • Site Preparation & Establishment: WHS compliance, service isolation, temporary protection of retained elements, and site access coordination.

  • Demolition & Internal Stripout: Full removal of non-structural internal elements, including partitions, ceilings, lighting fixtures, floor finishes, wall linings, joinery, signage, and tenant-installed fittings.

  • Electrical Disconnection: Safe termination and removal of light fittings, power outlets, data cabling, and switchboards as required, returning services to base build condition.

  • Mechanical & Fire Systems: Disconnection, removal, or reconfiguration of air conditioning systems, return air grilles, and diffusers. Fire protection systems including sprinklers, detectors, exit signs, and EWIS components adjusted or made safe in line with compliance.

  • Plumbing & Hydraulic Services: Disconnection of plumbing lines, capping of services, and removal of sinks, toilets, and other sanitary fixtures as applicable.

  • Make Good & Reinstatement Works: Concrete slab repairs, patching and painting of walls, ceiling grid reinstatement, and restoration of building fabric to original base building condition per lease requirements.

  • Compliance & Documentation: Coordination with building manager and landlord representatives to ensure works met make good obligations, with all compliance documentation and site inspections completed.

  • Final Cleaning & Handover: Removal of demolition waste, final site clean, and clear space handover ready for re-leasing or new tenancy works.