Project Details

Location

Pennant Hills, Northern Sydney, NSW

Industry

Not For Profit

Size

375m2

Value

$350k

Designer

DY Constructions Australia

Duration

8 weeks

Delivery Method

Lump Sum

  • Complete office fitout
  • Building manager approvals
  • Collaborative design process
  • New kitchen joinery
  • Acoustic ceiling baffles
  • Vinyl and carpet flooring
  • Partitioned meeting rooms
  • LED lighting upgrades
  • AV and data works
  • Server and comms relocation

Project overview

Office refurbishment and workplace upgrade delivered by DY Constructions for Catholic Care in Pennant Hills, Sydney.

Client Brief

Catholic Care engaged DY Constructions to deliver a comprehensive office refurbishment at their Pennant Hills facility, with a focus on improving workplace functionality and staff amenity.

The client sought support in refining the project brief and collaborated closely with DY through the design phase. DY developed concept layouts that included reconfigured meeting rooms, an upgraded staff kitchen, open-plan work zones, and integrated storage. The result was a tailored solution shaped through a collaborative office and workplace design process.

Challenges

The project was delivered during the end-of-year period, requiring precise scheduling during a high-demand time. DY Constructions worked under strict building management requirements, including compliance for core drilling works. This involved x-raying the concrete slab, obtaining a structural engineer’s report, and securing building manager approval. Some initial design elements provided by the client were found to be non-compliant and required redesign. Additionally, multiple stakeholders across the organisation and the building contributed to the design process, making coordination and alignment of feedback critical throughout the project.

The Solution

DY Constructions implemented strong project management practices and relied on experienced subcontractors to ensure quality delivery. Works were carefully scheduled, with after-hours construction carried out where necessary to minimise disruption to staff and building occupants. A collaborative design process was used to engage multiple stakeholders and refine the layout while maintaining compliance. Regular control group meetings were held to track progress, resolve challenges, and ensure alignment with building management requirements. Careful planning, coordination, and scheduling were key to keeping the project on track during the busy end-of-year period.

The Result

DY Constructions successfully delivered a refreshed and functional workplace tailored to Catholic Care’s operational needs. The scope included new partitioned meeting rooms, an upgraded staff kitchen, open-plan workstations, custom joinery, new flooring, and acoustic treatments. The fitout also involved electrical, plumbing, and fire services adjustments, all completed in line with building compliance requirements.

The client was highly satisfied with the outcome, smoothly relocating into their new premises. Following the project’s success, DY was invited to assist with works across Catholic Care’s other facilities — a reflection of the strong relationship built throughout the project.

Client Testimonial

We couldn’t be happier with the work undertaken by DY Constructions on our office refurbishment project. The team was highly skilled, responsive, and went above and beyond to ensure the project was completed on time and within budget. Our office is looking and feeling fresh, modern and welcoming which has significantly enhanced our work atmosphere.

Kate Saba
Executive Assistant

Get In Touch

Please Submit Your Enquiry and our friendly staff will contact you to arrange a free consultation at your premises to discuss your project in detail.

Scope of Works

  • Site Establishment: WHS compliance, floor protection, site setup, and delivery coordination with building management.
  • Demolition & Make Good: Removal of existing partitions, joinery, floor finishes, and make good to affected walls and ceilings.
  • Partitioning & Doors: Construction of new plasterboard and glazed partitions, MDF doors, and aluminium framed sliding doors.
  • Acoustic Treatments: Installation of wavebar baffles above ceilings in meeting rooms to reduce sound transfer.
  • Ceilings & Lighting: Ceiling tile removal and reinstatement; pendant light installation and LED lighting modifications.
  • Flooring Works: Removal and disposal of old floor finishes; preparation and installation of new carpet tiles and vinyl plank flooring.
  • Joinery & Fixtures: Custom kitchen cabinetry, overhead cupboards, splashback tiling, and new storage joinery in utility areas.
  • Electrical & Data: Power outlets, pendant lighting, switchboard updates, data points, AV connections, and server relocation.
  • Fire & Plumbing Services: Fire protection compliance, installation of sinks and tapware, and core drilling for kitchen drainage.
  • Painting & Finishes: Painting of new partitions, doors, existing walls, and patching where affected by demolition.
  • Cleaning & Handover: Rubbish removal, trade clean, and final site presentation upon completion.