1300 737 656

Call us now for your free site consultation. Specialising in Small, Medium and Large projects.

All Saints Grammar School
Belmore, South Western Sydney, NSW

Educational and science laboratory fitout delivered by DY Constructions for All Saints Grammar School

Project Details

Location

Belmore, South Western Sydney, NSW

Industry

Educational Facility

Size

85m2

Value

$170k

Designer

DY Constructions Australia

Duration

xxx weeks

Delivery Method

Lump Sum

  • Educational laboratory fitout
  • Custom science lab joinery
  • Vinyl safety flooring
  • Chemical storage integration
  • Services upgrade & compliance
  • New electrical & plumbing works
  • Lab-grade tapware & sinks
  • Fire protection adjustments
  • Secondary school facility
  • Belmore campus location

Project overview

Science Laboratory Fitout for All Saints Grammar School’s Belmore Secondary Campus

Client Brief

Brent Street engaged DY Constructions Australia to transform underutilised space within their Moore Park facility into a functional and purpose-built performing arts environment.

The client sought to expand their operations by adding new dance studios, office spaces, and breakout areas. DY worked closely with Brent Street through the design phase to ensure the layout, finishes, and functionality aligned with the needs of a high-performing and reputable dance institution.

Challenges

The project was delivered under a tight timeframe, with the client requesting completion during the school holidays and Christmas period to ensure the studios were operational before students returned. DY Constructions had to plan meticulously to coordinate a large number of subcontractors and specialist trades. Extensive mechanical, air conditioning, fire, and electrical adjustments were required to suit the reconfigured layout. Additionally, the client introduced numerous design changes and additional works throughout the build, requiring ongoing revisions to plans and quick turnaround on site adjustments.

The Solution

The DY Constructions team leveraged strong project management and deep industry expertise to deliver the project within the tight deadline. A large number of subcontractors were engaged and carefully coordinated to keep works progressing efficiently. The team remained flexible and responsive, adapting quickly to ongoing client revisions and changes to the scope. Clear communication, fast decision-making, and proactive scheduling ensured all elements were completed on time and to a high standard.

The Result

The project was successfully delivered on time, with the client expressing satisfaction with both the outcome and the process. Brent Street went on to engage DY Constructions for multiple additional projects, including further studio upgrades, acoustic improvements, and refurbishments to breakout areas, staff rooms, and training spaces.

The completed fitout included new dance studios, acoustic music rooms, administration offices, training rooms, and a custom reception area. Students and staff alike responded positively to the refreshed spaces, which now better support Brent Street’s daily operations and reputation as one of Australia’s leading performing arts institutions.

Get In Touch

Please Submit Your Enquiry and our friendly staff will contact you to arrange a free consultation at your premises to discuss your project in detail.

Scope of Works

  • Demolition & Site Preparation – Removal of existing flooring, services, fixtures, and redundant fittings in preparation for laboratory upgrade.
  • Partitioning & Compliance – Minor wall adjustments and wall linings to support services and meet school compliance requirements.
  • Joinery Installation – Supply and installation of custom-built science lab benches, chemical-resistant joinery, and integrated student workstations.
  • Flooring – Installation of new vinyl safety flooring suitable for laboratory environments.
  • Plumbing & Fixtures – New lab-grade tapware, sinks, drainage, and waste connections to suit science lab usage.
  • Electrical Works – Power outlets and data provisions for student benches, lab equipment, and teacher stations.
  • Mechanical & Fire – Adjustments to air circulation, mechanical ventilation, and fire protection to align with updated room usage.
  • Final Touches – Painting, compliance inspections, and final clean prior to student use.

Related Projects