1300 737 656

Call us now for your free site consultation. Specialising in Small, Medium and Large projects.

Judicial Commission of NSW
Sydney CBD, NSW

Office/Workplace project completed by DY Constructions

Project Details

Location

Sydney CBD, NSW

Industry

Government and Council

Size

200m2

Value

$200k

Designer

DY Constructions

Duration

5 weeks

Delivery Method

Lump Sum

  • Live environment refurbishment project
  • Completed in staged works
  • Council-approved CDC fitout
  • Vinyl plank flooring installation
  • Modernised reception area
  • Videoconferencing upgrade works
  • Reconfiguration of internal layout
  • Above-ceiling acoustic baffling
  • New meeting and seminar rooms
  • Building manager compliance achieved

Project overview

Office fitout and refurbishment delivered by DY Constructions for the Judicial Commission of NSW in Sydney CBD.

Client Brief

The client engaged DY Constructions to reconfigure and enhance their existing office layout. DY was responsible for design, approvals, and delivery of the fitout. Key objectives included creating additional meeting rooms by adjusting existing partitions, modernising AV equipment in the seminar room, refurbishing the reception area, and improving acoustic performance throughout the workspace. The aim was to create a more functional and contemporary working environment while maintaining operational continuity.

Challenges

The project was delivered within a heavily occupied live office environment, requiring a carefully staged construction program to minimise disruption to daily operations. Many of the existing rooms were outdated and required extensive upgrades, particularly the seminar and meeting spaces. DY also had to navigate strict building management requirements and coordinate works within limited access hours. Additional complexity arose from the need to maintain privacy and functionality for adjacent working areas during construction.

The Solution

To minimise disruption within the live office, DY Constructions implemented a four-stage works program, allowing construction to progress in isolated areas one at a time. Temporary containment barriers were installed to separate active work zones and reduce noise and dust impact. To address poor acoustic performance, above-ceiling acoustic baffling was specified and installed. The project was successfully delivered through detailed planning, clear communication, strong project management, and the support of reliable subcontractors.

The Result

The project delivered a full office refurbishment, including new meeting rooms, seminar room upgrades, acoustic enhancements, and a modernised reception area. Despite working within an occupied tenancy, DY Constructions minimised disruption and maintained building operations throughout. The client was highly satisfied with the result and the smooth delivery process, with staff responding positively to the refreshed workplace. DY also received further engagement from the client for additional refurbishment works. The project was completed to code, with building management satisfied and an Occupation Certificate issued upon completion.

Client Testimonial

Dear Ivan,

A belated thank you to you and your team for all your work. We are very pleased with the outcome and for all of your assistance.

Best wishes for the holiday break.

Kind regards,

Una Doyle
Chief Executive

Get In Touch

Please Submit Your Enquiry and our friendly staff will contact you to arrange a free consultation at your premises to discuss your project in detail.

Scope of Works

  • Site Establishment: WHS compliance, site protection, and coordination within an occupied office building.

  • Demolition & Make Good: Removal of existing walls, doors, and redundant services with patching and surface repairs.

  • Partitioning & Doors: Full-height plasterboard partitions, acoustic insulation, and solid core doors with compliant hardware.

  • Ceilings & Lighting: Adjustments to ceiling grid and installation of LED lighting upgrades.

  • Flooring & Finishes: New carpet tiles and vinyl flooring throughout common and office areas.

  • Joinery & Reception: Custom reception desk, kitchen cabinetry, and boardroom joinery.

  • Mechanical & Fire Services: Reconfiguration of AC units, grilles, and compliance upgrades to fire sprinkler and alarm systems.

  • Electrical & Communications: New power outlets, lighting controls, data cabling, and switchboard works.

  • Compliance & Certification: CDC documentation, certifier coordination, and approval management.

  • Finalisation: Site cleaning, waste disposal, and handover.

Related Projects